Welcome To WTCO Projects
Intercement measuring & repair Condition tower , Main stack , Kiln & Duct
MISR BENI SWIF CEMENT COMPANY
Design and supply and mounting supervision for a complete line from cement silo to JamboBag filling station 2ton, equipments design and supply for buffer silo with its accessories, bucket elevator, screw conveyor, butterfly valve, material and air pipes, roller conveyor and overhead crane, commissioning for the whole system.
INTERNATIONAL COKE & FERRO ALLOYS COMPANY (ICFC)
Design and supply complete loading station for coal, complete line extract coal from Big silo to Huber with its all accessories, bucket elevator feed the Huber and telescopic spout under the Huber, Complete supervision for the systems and control from CCR.
AIN EL SOKHNA SEAPORT (SHIP LOADING SYSTEM )
Complete design and supply for the ship loading system with its several accessories ,, vacuum gun and gun design with cascade telescopic spout , filter and all accessories .
Cascade chutes optimize the flow speed of the bulk material so that the grain size remains largely undamaged. The resulting dust is “caught up” in the wake of the sliding goods
Supervision of erection and commissioning .













